2015 Projects

Foyer (Fall 2015)

Before

Preparation

Demolition (1.5 days)

Cleanup (Mostly Beth’s doing)

Leveling the Driveway (Spring 2015)

Our homeowner’s insurance policy required we level some uneven sections of the driveway, since they were a tripping hazard. This involved Michael prying up some of the large chunks of concrete, removing the roots that had lifted/cracked the sections, and pouring new concrete to make the driveway level.

Painting the back of the house (Spring 2015)

Our homeowner’s insurance policy required that we repaint the back of the house, since exposed wood deteriorates more quickly.

Discovering more driveway (Spring 2015)

Leave a Reply